Standard Terms & Conditions

1.  Installation Work:

  1. All electrical installation work will comply with BS7671: 2018 Amd 1 and any amendments in force at the time of the works.

  2. All electrical installation work will comply with applicable Building Regulations in force at the time of the works.

  3. Where work is to extend or modify existing circuits, costs quoted assume that the existing installation is in adequate condition and complies with minimum current regulations. Any works found required to bring the necessary parts of the existing installation up to standard will be at additional cost.

  4. Unless stated otherwise, all cables will be concealed by chasing into the building fabric or concealed in building voids, under floors, etc. Where impracticable, cabling will be neatly surface run, either clipping direct or housed in trunking / conduit.

  5. Where carpet or flooring coverings may require lifting to allow concealed installation work, no charge is made for this service, with best endeavours being made to avoid damaging them and to refit them to an acceptable standard. However, consideration of employing a specialist fitter may be prudent, at your cost to effect a fully satisfactory reinstatement.

  6. Where agreed before hand, chases to walls, etc will be re-filled to 2mm below plaster finish depth, however final finishing of skim coat plaster and final decoration is excluded.

  7. All endeavours will be made to undertake installation work to a clean standard, using dustsheets and vacuum cleaning equipment as necessary.

  8. The contract outlines the expected duration of the installation work.

  9. Whilst undertaking the installation work at the property, the client is required to provide water, power and toilet facilities free of charge

 

2.  Exclusions:

  1. Clearing and / or moving of furniture, floorboards and other items blocking access to work areas are not included.

  2. Except where detailed, builders work (creating of holes larger than 50mm diameter, creating of support structures, etc) are not included, except as outlined in 1d, e and f above.

  3. Re-decoration and final making good is excluded from quoted costs, unless specifically detailed as included.

  4. Removal from site and disposal of rubble, fittings, wiring, materials, general waste and packaging is not included.

 

3.  Extras and Variations:

  1. Estimate includes standard white Click switch gear and any other makes or finishes required by client, unless already stated in details above, will be classed as a variation.

  2. All extras and variations must be agreed in writing prior to commencement including a price estimate.

  3. The addition of extras and variations will inevitably extend the expected duration of the installation work and this must be agreed in writing prior to commencement.

 

4.  Pricing:

  1. The costs quoted assume continuous and unhindered access to the site by prior arrangement with you.

  2. Unless stated otherwise, the costs quoted assume standard working hours between the hours of 08:00 hrs - 17:00 hrs Monday to Friday inclusive. Work required outside these hours may attract out of hours premium rates.

  3. Any additional work not covered in our quoted costs will attract additional minimum time charge rate of £34.00 per hour plus materials cost and VAT.

  4. All figures quoted are valid for a date of 28 days from the date of the estimate or quotation.

  5. If electrical work has been requested and organised (either by phone, email, text/ Wifi message or face to face) and carried out without a written quote or estimate being obtained it is assumed that the client accepts Ormerod Electrical Ltd standard charges of day/ half day/ hour rate (prices on request) per electrician, apprentice or labourer on site and will be invoiced at any time. In this instance all other terms and conditions still apply.

 

5.  Deviations from Building Regulations and BS7671:

  1. All work where applicable, will be executed fully in compliance with applicable Building Regulations and BS7671 in force at the time of the work, particularly in respect of work in dwellings to allow the legal Part P obligations to be met. Where a Client requires deviation from such regulations, a written instruction and record will be required.

 

6.  Risk and Title of Goods and Property:

  1. The risk in all goods supplied shall pass to the Client upon delivery.

  2. All goods supplied shall remain property of Ormerod Electrical Ltd until all sums due have been paid in full.

  3. The client is responsible for ensuring that the property is insured for the duration of the installation work.

  4. If the presence of Asbestos is suspected on site at any time Ormerod Electrical reserves the right to terminate work and demand that the client arranges for relevant testing to be carried out and all risks to health of employees be alleviated before work is resumed. In the event of such circumstances all testing and risk assessment must be done by a specialist company and any arrangements and costs are solely the responsibility of the client. Extra charges for inconvenience to Ormerod Electrical Ltd may also be incurred in this instance.

  5. A risk assessment shall be carried out on the site before commencement of work. If we believe the site to be High Risk and unsafe for staff, we reserve the right to withdraw from the contract of work at no cost to Ormerod Electrical Ltd. In the event of dogs or children/ vulnerable adults being present on site we will ask that they be removed. If this is not adhered to, we reserve the right to withdraw from the contract of work at no cost to Ormerod Electrical Ltd.

  6. We expect our staff to have access to usable toilet facilities while on site. If toilet facilities are not available we reserve the right to allow staff to travel to the Ormerod Electrical office toilet at additional cost to the client.

 

7.  Warrantee:

  1. Ormerod Electrical Ltd warrants its installation work to be defect free for a period of twelve months from invoice date. Such cover does not extend to goods not supplied by Ormerod Electrical Ltd, physical damage to products, or any instance where the original installation has been altered or tampered with subsequently by third parties.

 

8.  Payment:

  1. Unless agreed in writing payment in full must be made on completion of the specified works to Ormerod Electrical Ltd.

  2. Stage payments will be requested and invoiced where planned works take longer than 7 days.  We reserve the right to request from you stage payments in the instance where works take longer than 14 days. 

 

9.  Dispute Resolution:

a) In the event of a dispute, mediation is to be the preferred method of resolution.

 


Privacy Policy 

Ormerod Electrical Ltd collects personal data such as your name, phone number, email address and home address, to contact you about your requested electrical work. When you enquire about or book our services and opt in to providing us with this information; we have your consent to contact you about your job or contract. We also collect consent on our Terms and Conditions document we require you to sign.

We use Wix to build our website. For information on how Wix handles site visitors' data please review sections 8, 12, and 13 of Wix's Privacy Policy

We do not use any details for marketing purposes and will not pass on data to any other third parties unless you have specifically asked us to.

We lawfully process personal data which was provided to Ormerod Electrical Ltd by you on the basis of consent, or contract. We process necessary personal data as part of a contract to which you are a party, or in order to take steps by your request prior to entering a contract.

You are entitled to access the personal information that we hold. Email your request to leightonormerod@icloud.com.

 

You can unsubscribe to our emails at any time by following the unsubscribe instruction at the bottom of any of our emails or by emailing leightonormerod@icloud.com. 

 

You can also write to us at Ormerod Electrical Ltd, 5 Ford Road, Wiveliscombe, Taunton, Somerset TA4 2NJ.

Individuals have a number of rights outlined by the General Data Protection Regulation (GDPR):

  • to withdraw consent for us to contact you 

  • to access your personal data and have it edited or deleted

  • to object to certain types of processing, e.g. direct marketing or profiling

  • to be told how long data will be held for

  • for your data to be transferred

  • to make a complaint if you believe we are misusing your personal data

We treat all personal data as strictly confidential and are committed to ensuring that your information is secure. We take every measure to prevent unauthorised access or disclosure, we have put in place suitable physical and electronic precautions to safeguard all information we collect.

 

Changes to our Privacy Policy and Terms and Conditions.

We keep our privacy policy and terms and conditions under regular review. Ts&Cs and this Privacy Policy were last updated May 2019.

 

Cookies Policy

Cookies are small pieces of data stored on a site visitor's browser used to keep track of their movements and actions on a site. 

Our website is built using Wix. Cookies are implemented in every site built by Wix. Below is a table to view which cookies Wix implements on Wix sites: